The Toback CDMS Group is actively involved in the analysis of CDMSLite experiment, HVeV detector, and parameter tuning for TESSim and CrystalSim simulations.
Projects and Information
Active CDMS Analysis Projects:
- CDMSLite Analysis
- High Voltage eV (HVeV) Analysis
- Parameter Tuning for CDMS Simulations
- Simulation Validations
Completed/Inactive CDMS Analysis Projects:
- Vibrational Noise Study
- Correlation and Phase of Electronics Noise
- Low Threshold Analysis
- High Threshold Analysis (T2Z1 HT Sandbox Study)
- High Threshold Analysis (Trigger Burst Cut R133, R134)
- High Threshold Analysis (NuMI Time Coincidence Cut for Run 134)
- High Threshold Analysis (Muon-Veto Efficiency Check for HT R133 and R134 Analyses)
- Multi-Template Filter Position Reconstruction
Recent CDMS Analysis Activity
FastDMC: Parameterized Detector Response
Talk by Michael Kelsey at the SuperCDMS Analysis WG
CDMSliteSimTalk4: Pulse Tail Study and Relative Calibration
Talk given by Lei Zheng at Simulation Working Group Meeting
Ge HV Mock Analysis Plan
Talk given by McKay Osborne at Backgrounds Working Group